As a subsidiary of CPEG, additional thermal and dry solids processing and material handling equipment is available to supplement and build out your production line.

Dust Collectors, Wet Scrubbers, Conveyors, Mixers, Drum Dryers, and more.

pilot-testing-lab

How Product Testing Labs Reduce Risk and Improve ROI in Thermal Processing Projects

When investing in thermal processing equipment—such as rotary dryers, kilns, or calciners—manufacturers and processors face a critical challenge: Will this system perform as expected for my specific material and process needs? One of the most effective ways to answer that question, reduce risk, and accelerate ROI is through product testing labs.

At Heyl Patterson Thermal Processing, our Innovation Center serves as a controlled, pilot-scale environment where clients test real materials using full-function thermal systems. The result? Data-driven equipment decisions, minimized production delays, and confidence before making a capital investment.

Why Buyers Prioritize Material Testing

If you’re in the evaluation stage of your buying journey, material testing isn’t just a nice-to-have—it’s a critical part of de-risking your project.

Product testing labs like Heyl Patterson’s Innovation Center help you:

  • Identify potential processing issues such as corrosion, caking, or material buildup—before full-scale installation.
  • Select the right thermal system—rotary dryer, calciner, or indirect system—based on real test data.
  • Reduce capital risk by ensuring your material can be handled without costly retrofits post-installation.
  • Optimize operating parameters, such as airflow, retention time, and heat profile, to achieve maximum efficiency.

This is especially important if your material has unknown or variable properties (e.g., high moisture content, abrasiveness, or sensitivity to heat).

Heyl Patterson’s Innovation Center: Testing That Supports Confident Decision-Making

Our Innovation Center is engineered to help you simulate your production environment and confirm process viability before committing to equipment at scale.

Capabilities include:

  • Testing with rotary dryers, rotary calciners, and indirect heating systems.
  • Real-time data collection on thermal profiles, moisture reduction, particle behavior, and throughput.
  • Customized configurations to mirror your application and processing goals.

This facility bridges the gap between pilot testing and full-scale production—giving you proof, not promises.

From Testing to Full-Scale Production: What You’ll Gain

The product testing process gives your engineering and operations teams an actionable roadmap for scaling successfully.

You’ll be able to:

  • Accurately size your system for throughput and residence time.
  • Validate heat transfer and moisture removal requirements.
  • Uncover necessary design modifications like anti-corrosion coatings, lifter redesigns, or wear-resistant liners.
  • Establish control variables like airflow, retention time, and thermal profile early in the design phase.

Reduce Thermal Processing Risk and Improve Project Certainty

Our Innovation Center enables you to simulate your real-world processes and identify design needs before committing to equipment procurement.

Contact Heyl Patterson to learn more about our product testing lab and how it supports smarter capital investments in thermal processing.

Contact us today to schedule a consultation or testing evaluation.

Last updated on December 18th, 2025 at 03:50 pm